Church Building Development Group 2016 Report

The Church Building Development Group explored possible changes to the church building and the basement in light of the evolution of the mission, worship and functions
of the parish. This did not include the Parish House, nor the extended property around the church. The intention is to provide a cohesive vision and plan for the longer term development of the church building as it serves the ongoing life of the church community.

The Report

  1. Summary
  2. Complete Report
  3. Appendix A
  4. Appendix B
  5. Appendix C is not currently available
  6. Appendix D is made up of the drawings below. Notes for the drawings are in the Complete Report  (section 8, page 11). 
  7. Appendix E 

Drawings of Appendix D

 

sjd-01_main_floor_level_existing.jpg

SJD-01 Main floor level existing
SJD-01 Main floor level existing

sjd-02_main_floor_level_extended_chancel.jpg

SJD-02 Main floor level extended chancel
SJD-02 Main floor level extended chancel

sjd-03_main_floor_levelled_nave.jpg

SJD-03 Main floor levelled nave
SJD-03 Main floor levelled nave

sjd-04_main_floor_corridor_rework.jpg

SJD-04 Main floor corridor rework
SJD-04 Main floor corridor rework

sjd-05_main_floor_n_entry_paved.jpg

SJD-05 Main floor N entry paved
SJD-05 Main floor N entry paved

sjd-11_basement_plan_existing.jpg

SJD-11 Basement Plan existing
SJD-11 Basement Plan existing

sjd-12_basement_plan_interior_ramp.jpg

SJD-12 Basement Plan interior ramp
SJD-12 Basement Plan interior ramp

sjd-13_basement_plan_improvements.jpg

SJD-13 Basement Plan improvements
SJD-13 Basement Plan improvements

sjd-14_basement_plan_incl_new_stairs_and_elevator.jpg

SJD-14 Basement Plan incl new stairs and elevator
SJD-14 Basement Plan incl new stairs and elevator